title: Top 3 Points to Consider Before Scheduling an HVAC Balance
description: There are a few items that you need to take care of BEFORE you schedule a test and balance. Read Melink's top 3 pre-check items.
image: https://blog.melinkcorp.com/hubfs/Jeremy_Mock_balance2.jpg
---

<https://melinkcorp.com/>

- [Services](https://melinkcorp.com/services/) 
    - - - [Services Overview](https://melinkcorp.com/services/)
                  - [Building Commissioning](https://melinkcorp.com/services/building-commissioning/)
                  - [Test, Adjust & Balance](https://melinkcorp.com/services/test-adjust-and-balance/)
                  - [Test, Adjust & Balance FAQs](https://melinkcorp.com/services/test-adjust-balance-faqs/)
          - - #### Why we do what we do
                    
                    “We’ll build a 7 figure new store and we’ll fight with the A/C or negative air pressure for months or years, all because the equipment was never set up properly, causing problems that extend for the life of the building. Your reports allow us to know everything is set the way it should be from the beginning.”
                    
                    *Director of Facilities for a national restaurant chain*
- [Kitchen Hood Controls](https://melinkcorp.com/kitchen-hood-controls/) 
    - - - [Intelli-Hood Overview](https://melinkcorp.com/kitchen-hood-controls/)
                  - [Intelli-Hood FAQs](https://melinkcorp.com/kitchen-hood-controls/intelli-hood-faqs/)
                  - [Intelli-Hood Resources](https://melinkcorp.com/kitchen-hood-controls/intelli-hood-resources/)
          - - #### Why we do what we do
                    
                    > “Our engineering department worked with the engineers from each of our hotel brands and fully evaluated Intelli-Hood. Everyone is convinced that this is one of our most cost-effective paths to sustainability.”
                    > 
                    > *SVP Operations New Development at Leading Global Hotel Chain*

[tel:15139657300](tel:15139657300) <https://blog.melinkcorp.com/blog/top-3-points-to-consider-before-scheduling-hvac-balance#contact-us>

- [Services](https://melinkcorp.com/services/) 
    - [Building Commissioning](https://melinkcorp.com/services/building-commissioning/)
    - [Test, Adjust & Balance](https://melinkcorp.com/services/test-adjust-and-balance/)
    - [Test, Adjust & Balance FAQs](https://melinkcorp.com/services/test-adjust-balance-faqs/)
- [Kitchen Hood Controls](https://melinkcorp.com/kitchen-hood-controls/) 
    - [Intelli-Hood Resources](https://melinkcorp.com/kitchen-hood-controls/intelli-hood-resources/)
    - [Intelli-Hood FAQs](https://melinkcorp.com/kitchen-hood-controls/intelli-hood-faqs/)

[About](https://melinkcorp.com/about/)

- [Green Buildings](https://melinkcorp.com/about/melink-green-buildings/)
- [Careers](https://melinkcorp.com/about/careers/)
- [Contact](https://melinkcorp.com/contact/)

# Green Link

Sharing our expertise to help you succeed

![](https://blog.melinkcorp.com/hubfs/Amy%20Willenborg.jpg) [Amy Willenborg](https://blog.melinkcorp.com/blog/author/awillenborg)

 8/19/19 8:00 AM

[HVAC Test & Balance](https://blog.melinkcorp.com/blog/topic/hvac-test-balance)

- [Tweet](https://twitter.com/share)

There are a few important items that you want to take into account before you schedule an HVAC balance. 

While these three points may seem obvious, there are many instances where a technician arrives on site and the job isn't quite ready, or he/she can't access needed areas. These tips can save time and money for everyone!

 

#### 1. HVAC equipment is installed and operational.

This one seems like a no-brainer! However, there are always occurrences when a technician arrives onsite to perform a balance and necessary equipment either hasn’t been installed or isn’t properly operational. Examples include [VAVs](https://melinkcorp.com/test-balance/variable-air-volume-systems)or dampers that haven’t been installed, or an RTU that isn’t operational.

Ensuring that all [ductwork](https://blog.melinkcorp.com/blog/hvac-ductwork-design) has been completed; balancing dampers are properly installed; any grilles, registers and diffusers are installed; and the RTUs have clean filters helps make sure a technician can provide a proper air balance, as well as mitigate any potential return service costs. Making sure that all equipment (especially RTUs) have undergone a proper start-up to confirm power should always be completed ahead of Melink’s arrival.

 

#### 2. All HVAC equipment can be easily accessed by a technician.

Another hindrance to any proper [test & balance](https://melinkcorp.com/test-balance) is not being able to access the necessary equipment. This includes equipment installed inside the building, as well as equipment on the roof. When working with a customer located inside a mall or shopping center, security and approved roof access becomes another added component.

Melink typically requires assured access to all applicable HVAC system equipment, including RTUs, VAVs, exhaust fans, dampers, etc. Access to fully open dampers, ceiling-height diffusers, and thermostats that may be in an office is necessary to properly complete the balance. Our Account Coordinators will also discuss roof access, security measures, and accessibility to ladders or lifts when coordinating the job with you.

 

#### 3. Allot adequate time (2-3 weeks) to schedule and complete the balance.

Though some seasons are busier (or slower) than others, our goal at Melink is to provide every customer the same level of service excellence no matter the time of year. This includes communication with the customer, scheduling the site visit with one of our National Network technicians, performing the balance,  working with the customer on any punch-list items, and finally providing a certified  
test and balance report.

Our team of National Account representatives and technicians work with the customer through each step of the process. Scheduling an HVAC balance<https://melinkcorp.com/contact>with Melink approximately 2-3 weeks out from new construction/remodel turnover will help to ensure a proper and complete balance. It also allows enough time to work through any punch-list items or lingering comfort issues for the customer.

Questions? Drop a comment below or call Melink at (513) 965-7300.

 

 

![Amy Willenborg](https://blog.melinkcorp.com/hubfs/Amy%20Willenborg.jpg)

#### About [Amy Willenborg](https://blog.melinkcorp.com/blog/author/awillenborg)

Amy is Melink Corporation's Director of Customer Experience. She helps to oversee Melink's national test and balance team.

## Most Popular Blog Posts

### Recent Posts

### VIEW BLOG POSTS BY TOPIC

- [HVAC Test & Balance (50)](https://blog.melinkcorp.com/blog/tag/hvac-test-balance)
- [DCKV (49)](https://blog.melinkcorp.com/blog/tag/dckv)
- [Employee Owned (35)](https://blog.melinkcorp.com/blog/tag/employee-owned)
- [Energy Efficiency (27)](https://blog.melinkcorp.com/blog/tag/energy-efficiency)
- [Building Health (21)](https://blog.melinkcorp.com/blog/tag/building-health)
- [Climate Change (13)](https://blog.melinkcorp.com/blog/tag/climate-change)
- [Construction (10)](https://blog.melinkcorp.com/blog/tag/construction)
- [Commissioning (8)](https://blog.melinkcorp.com/blog/tag/commissioning)
- [Green (8)](https://blog.melinkcorp.com/blog/tag/green)
- [Renewable Energy (6)](https://blog.melinkcorp.com/blog/tag/renewable-energy)
- [Corp (5)](https://blog.melinkcorp.com/blog/tag/corp)
- [Zero-Energy Building (5)](https://blog.melinkcorp.com/blog/tag/zero-energy-building)
- [Electric Vehicle (4)](https://blog.melinkcorp.com/blog/tag/electric-vehicle)
- [Solar PV (3)](https://blog.melinkcorp.com/blog/tag/solar-pv)
- [HQ2 (2)](https://blog.melinkcorp.com/blog/tag/hq2)
- [Geothermal (1)](https://blog.melinkcorp.com/blog/tag/geothermal)

See all

## Most Recent Blog Posts

### Recent Posts

### Subscribe to Email Updates

## CONTACT US

**Global Headquarters:**  
Melink Campus  
5140 River Valley Road  
Milford, OH 45150 USA  
513-965-7300

© Copyright 2025, Melink Corporation. All Rights Reserved.

- [About Us](https://melinkcorp.com/about/)
- [Privacy Policy](https://melinkcorp.com/privacy-policy/)
- [Terms & Conditions](https://melinkcorp.com/terms-conditions/)

[LinkedIn (opens in new window)](https://www.linkedin.com/company/melink-corporation) [YouTube (opens in new window)](https://www.youtube.com/channel/UCsa6oLcgZPSwAY4R1_NurRA) [Twitter (opens in new window)](https://twitter.com/MelinkCorp) [Facebook (opens in new window)](https://www.facebook.com/MelinkCorp)